SetclockSetclockHelp

Build and edit the lineup

Add sets and changeovers, set lengths, decks and start times, reorder the running order and check every stage on the timeline before doors.

Web appOwners, admins and stage managersUpdated Nov 22, 20264 min read
On this page

Lineup at a glance

  • Pick the day at the top (the live day has a dot), then the stage tab. Each tab shows its number of sets.
  • List shows one stage's running order; Timeline shows every stage of the day side by side.
  • Each row shows Start and end, Artist, Type, Length, Status and an Auto-start switch. Doors sits at the top; the curfew row at the bottom says how many minutes you have to spare, or Projected 12 min over.
  • Status reads On now, Played, how late a set is running, or After curfew for a set projected to end after it.
A stage's running order in List view, from Doors at the top to the curfew at the bottom.

Add or edit a set

  1. Press Add set, or press an artist's name to edit it. The editor opens as Add to running order or Edit item.

  2. Type the Artist and pick a Set type: Soundcheck, Opening, DJ set, B2B, Live or Headliner.

  3. Pick a Deck (A, B, C, 1, 2, 3) or type any label up to 16 characters, such as CDJ 3–4. It shows on the monitor and next to the act when it's up next.

  4. Set Duration (min). Leave Scheduled start empty to start straight after the item before, or type a time (24-hour) to pin it.

  5. Leave Auto-start on so the set starts when the previous item ends. When a new set or a changed time would move the ones after it, turn on Push following sets to move them too.

  6. Add Crew notes if you need them: Contact, Tech and Notes. They show in Lineup and Run show for the crew and never on screens.

  7. Press Add or Save changes.

Changeovers

Press + Changeover between two sets to add a 15-minute changeover that starts when the set before ends, then change its length in the editor. You can also switch Item type to Changeover in the editor. Imports add changeovers in gaps of up to 3 hours. Changeovers don't count toward your plan's sets.

Reorder, auto-start and clear

  • Drag a row to a new place, or use its up and down arrows.
  • Turn Auto-start off on a row to hold that item until someone presses Start. To switch auto-start off for the whole show, use Settings › Show › Running order › Auto-start.
  • Clear stage removes every set and changeover on the stage and stops its timer; doors, curfew, branding and links stay. Press Clear running order to confirm, and Undo is offered for 10 seconds.
  • Delete one item from its editor: Delete, then Tap again to delete. Undo is offered for 10 seconds.

Timeline and checks

Switch to Timeline to see every stage of the day on one time axis, with a red line at each curfew and a line at the current time. Press a stage name to open its list. Checks beside it shows All clear, or each problem: a stage that runs past curfew (with a one-tap trim you can undo), an artist booked on two stages at once, and changeovers under 10 minutes.

Every stage side by side, with the checks for curfew, double bookings and short changeovers.
It says "Only Soundcheck can be scheduled before doors (18:00)."

Change the start time to doors or later, set the Set type to Soundcheck, or move doors earlier in Settings › Days and stages.

Add set is greyed out with a lock

Your plan's sets across all shows are used. Set limit reached shows the count and Ask for more sets. Archived shows' sets count too.

Lineup says "You can view this show"

Your role is Viewer. An owner or admin can change your role in Organization › Team. See Roles and permissions.

My change went back a minute later

The stage follows a Google Sheet. Edit the sheet instead, or press Stop following in the bar above the running order.

Did this answer your question?